Volume 17 Issue 26 | Nov. 19 - 25, 2004
Downtown Express photo by Jennifer Bodrow
Pier 40
Most of the artificial-turf surface for a new, interim sports field has been rolled out on Pier 40s inner courtyard. New lights for nighttime use have also been installed. The strips of FieldTurf still need to be sewed together and a mix of sand and rubber pellets still needs to be poured onto it to provide give and cushioning. There wont be any locker rooms built on the pier at the end of W. Houston St., but bathrooms will be available for clothes changing. The sports facility is slated for an early-January opening, with a gala ribbon-cutting ceremony slated for spring. Permits have been distributed for use by local youth and adult leagues until the spring season, when new permits will be issued.
|
Downtown Express is published by
Community Media LLC.
Downtown Express
487 Greenwich St.,
Suite 6A | New York, NY 10013
All rights reserved.
Downtown Express and downtownexpress.com
are registered trademarks of Community Media, LLC
John W. Sutter, president
|
|
|
|
|
Home
Downtown Express is published by
Community Media LLC.
Downtown Express | 487 Greenwich St., Suite 6A | New York, NY 10013
Phone: 212.242.6162 | Fax: 212.229.2970
Email: news@downtownexpress.com
|
Written permission of the publisher must be obtainedbefore any of the contents of this newspaper, in whole or in part, can be reproduced or redistributed.
|